A good bit
of hand excavation was done with this foundation job.
An extremly
well built rebar cage for Foundation "A" ready to be lowered into the ground.
Raising the tower into a vertical
position.
You can never have a big enough crane
for the job!
Aligning the
tower over the foundation, and bolting up.
With the HD-70 bolted in place, the
3/8" lifeline is now fitted to the leg of Section 1.
Home
] [ Tower Information
] [ Tower
Photos ] [
Contact
Us! ] [ Advantages
] [ Loading Tables
Copyright © 2003 AN Wireless Co. webmaster |