|
A picture perfect
rebar cage, built using the supplied CAD drawings from AN Wireless.
2x4's can greatly
help keep the foundation in position during the concrete pour.
The 5' foundation
section, plus Tower Section 1 awaiting concrete.
Bolting the
remaining step bolts in place to the remaining 7 sections.
Since this installation was done
at an active construction site, equipment was
The finished
tower, with a live internet web camera affixed to the top.
Home
] [ Tower Information
] [ Tower
Photos ] [
Contact
Us! ] [ Advantages
] [ Loading Tables
Copyright © 2003 AN Wireless Co. webmaster |