Installation - Some photos of an HD-100 Tower being installed in Central Arkansas.

Altheimer High School - Altheimer, Arkansas

This quality installation job was done by Skyward Tower Specialists, Inc, of Franklin, AR.
Wesley Wallace, the company owner, can be reached at (800)-292-7181.


This HD-100 was delivered to the jobsite by the AN Wireless Tower Company to be
used at this High School to provide a wireless microwave communications link to
the University of Pine Bluff, in Pine Bluff, Arkansas.
 
 

Section #1 in place over the foundation.
 
 

As is usually the case, our taller towers are often lifted in
a single piece, roughly 2/3 of the way up the structure. The
solid lattice design permits this operation to be done safely.
This also allows the tower installation to be done literally in
 a matter of minutes.
 
 

A day with little wind is appreciated by the tower hands.
 
 

Making the connection between Sections 1 & 2.
 
 

This tower will offer a rock solid link between two
buildings 30+ miles apart.



Home  Towers  Reinforcements  Photos  |  Advantages  |  Ordering  |  Shipping  |  Calculators  |  Prices  Contact

ANW Towers, LLC